Minimal concrete:
If concrete is required, it is only used to stabilize the upper portion of a piling. This saves a great deal of time on construction projects!
No over-designing:
Each helical pile is drilled down to a specified torque or PSI. Each piling load capacity is known at all stages of installation. We drill to a depth defined by engineers' loading prerequisites. All depths are contingent on the soil condition in each precise installation location.
Insignificant excavation requirements:
Piles can be drilled into an existing ground contour or pre-excavated platform. Once installed, no soil removal is necessary. We're capable of installing helical piles in all weather conditions.